Substations Turnkey Solutions
INTENET transformer centers and power plants (HES, RES and Thermal power plants) are equipped with turnkey high voltage protection control, Scada- Automation and communication system installations. It provides service to its customers with 24-hour intervention and 100% customer satisfaction principle after installation.
References
Here are a few references where we have the opportunity to work and offer solutions throughout Turkey.
TEIAS Communication Solutio
Teiaş OPGW Solutions
OPGW (Optical Ground Wire) Fiber Optic conductor solution is TEİAŞ’s communication system via Fiber Optic Cables drawn on 154 KV and 380 KV lines. Both ends of the OPGW lines are provided by pulling the non-metallic fiber optic cable into the telecom chamber after ending in the OPGW box on the OPGW pole and installing SDH devices and Multiplexer devices at the end
RES, HES, Thermal Power Plant
TESAS RTU Solutions
RTU provides central control in sacada systems with its shortest definition and performs the task of communication between the center and the sacada system. It was formed by combining the bar letters of the English words Remote Terminal Unit. As can be understood in English, physical equipment in the field collects sensors, inputs and outputs and measuring device data and transmits it to the central unit. At the same time, the information in the central unit provides remote control in the lede field
Accurate and Innovative in TEİAŞ and Energy Sector, Communication Sol
You can find the latest news about our company and the sector here.
Projects We Have Completed
Alkumru HES-Siirt TM-Siirt Turf TM OPGW lines were terminated in the project. Raisecom STM1 SDH and RC3000-15 Multiplexers were established.64K rental line Cisco Multiplexers and Elazig YTM connection was made and RTU and PAX communication was provided. DCE FSK Modem and Karel DS200 PAX were used in the project.
In the project, kargı HES – Meadowhan TM OPGW lines were terminated. Raisecom ITN2100 STM4 SDH-MULTIPLEXER was established.64K rental line Cisco Multiplexers and Lakeside YTM connection was made and RTU and PAX communication was provided. DCE FSK Modem and Karel DS200 PAX were used in the project.